Overview
Replace your diesel generator with a Battery Energy Storage System (BESS). A 50 kW hybrid inverter + LiFePO₄ battery bank delivers silent, zero-fuel backup power — with a lower 5-year cost of ownership than running a DG set, even before adding solar. Ideal for commercial, industrial and institutional sites with frequent power cuts and existing DG dependency.
Key Benefits
- → Zero fuel cost — eliminate diesel expenses completely
- → Lower 5-year total cost of ownership than a DG set, even without solar
- → Silent, zero-emission operation — safe for indoor and commercial use
- → Fast response and intelligent energy management vs. DG start-up delay
- → Future-ready — pair with solar for maximum savings and faster ROI
- → Minimal maintenance — no moving parts, no fuel supply chain
How It Works
Load and DG runtime assessment
Techedge audits your existing DG fuel bills and outage pattern to size the right BESS capacity.
Hybrid inverter + battery installed
A hybrid inverter and LiFePO₄ battery bank replace the DG set at the distribution board — no rewiring of loads.
Automatic switchover on grid failure
The system detects grid outage and switches to battery power within milliseconds — no manual start, no warm-up delay.
Optional solar integration
Add rooftop solar to recharge the battery for free during the day, maximising savings and cutting payback time further.
Ideal For
Real Project — Real Numbers
Featured Case Study
Studer Hybrid System, Bengaluru — Zero-Downtime Backup
21 kVA 3-phase hybrid inverter + LiFePO₄ battery rack installed inside a live motorcycle showroom, replacing generator dependency for billing, lighting and service bay loads.
